WATER AUTHORITY
• Standard application
• Plan approval
• Site inspections
GAS AUTHORITY
• Standard application
• Single lot connection (max 6m setback)
TELEPHONE
• Service conduit with draw wire
(avoids yard damage by Telstra)
ELECTRICAL AUTHORITY
• Standard application
• Site establishment fee
STATUTORY REQUIREMENTS
• Long service leave levy payments
• Home owner warranty insurance
|
WORKCOVER REQUIREMENTS
• Temporary fencing to secure building site
• Scaffold (single storey) up to 75 lineal metres (single storey
home)
• Scaffold(single storey) up to 45 lineal metres (two storey home)
• Two storey scaffolding
COUNCIL REQUIREMENTS
• Standard application fees
(including development application and construction
certificate)
• All weather access material to driveway entry
• Silt fence (maximum 20 lineal metres)
• Trade waste enclosure
• Waste management plan
• Statement of environmental effects
• Site analysis plan
• Mine Subsidence Board approval if required (does not allow for any special requirements) |
GENERAL
• Basix certificate
• Nathers assessment (if required)
• Wall and ceiling insulation
• Draft seals and whether strips to external door
• 3 star rated water saving tap ware
• 4 star rated water saving toilet suites
CLOTHES LINE
• External fold a line
|
RECYCLED WATER CONNECTION
WHERE AVAILABLE (OR) ABOVE GROUND WATER TANK
• 3000 litre water tank and system inc: diversion kit, filter system and backflow prevention (water conservation initiative)
• Reinforced concrete base as support (stability for water tank)
• Overflow from water tank to either the street or easement
• Charged stormwater system using 90mm PVC diameter, round downpipes
as required
• Rainwater tags
• Plumbing from tank to services: wc’s, laundry and one external tap
• Installation with plumbing and electrical connections as required
• Certification from plumber
|
SITE PREPARATION
• Soil and wind speed test
• Surveying (slab peg out)
• Site sign
• Temporary site WC and shed
• Fixed cost wind classification up to N2
PIERING
• Fixed cost for up to 70 lineal metres of cast in-situ concrete piers
• Engineer inspection and certification
• Concrete pump (if required)
WATER SERVICE
• 20 mm short water service (maximum 6 lineal metres)
• Standard drilling
ELECTRICAL SERVICE
• Underground 3 phase service (maximum 6 metre setback)
Note: The 3 phase metre to meter box is not included
• Standard connection for applicable loads
• Certificate from electrician provided |
EXCAVATION
• Cut and fill up to 1 metre fall across the building platform
SLAB
• Fixed cost for up to M class classification
• 2 brick course step down to garage (subject to fall and driveway gradient)
• 1 course step down to porch and alfresco
(subject to engineer design)
DRAINAGE
• Fixed cost up to 40 metres of 100mm sewer line
• Fixed cost up to 60 metres of 90mm stormwater line
• 3 surface water inlet drains to drain stormwater
|